Limit the power generation at the slack bus.
2 次查看(过去 30 天)
显示 更早的评论
Good day,
How can limit the power generation at the slack bus so that it does not increase after running the simulation?
please help
0 个评论
回答(1 个)
arushi
2023-12-21
Hi Adao,
I understand that you want to limit the power generation at the slack bus to prevent it from increasing during the simulation. Since active power delivered by Generator Bus and consumed by Load Bus differ, this means that a power loss equal to the difference between Generator Bus P and Load Bus P is occurring. Since active power delivered by Generator Bus and consumed by Load Bus differ, this means that a power loss equal to the difference between Generator Bus P and Load Bus P is occurring. Therefore, to supply power loss, an extra Generator bus is considered for which bus magnitude and voltage is specified and active power and reactive power are to be calculated. This active power of slack bus is the equivalent power loss occurring in different system. To limit the power at the slack bus you can try setting constraints on the Generator power outputs as well as the Load bus generator power outputs.
Hope this helps.
Thank you
另请参阅
类别
在 Help Center 和 File Exchange 中查找有关 Switches and Breakers 的更多信息
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!