Info

此问题已关闭。 请重新打开它进行编辑或回答。

How to create a alternative sample time to Integrator blocks such that Integration is done at higher sample rate in a triggered subsystem?

1 次查看(过去 30 天)
I have a model running with one millisecond sample time. I would like to run a one of the subsystems at a sample time 0.1 milliseconds inside this model. So, I made this a triggered subsystem with a function call generator with 10 Iterations. The Integrators inside this triggered subsystem are still calculated with the sample time of one millisecond where as I expect Integration done at 0.1 millisecond. Any help would be deeply appriciated. Thanks

回答(0 个)

此问题已关闭。

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by