Import elements of an array from workspace

3 次查看(过去 30 天)
Hi, I've created this model in Simulink to import elements of an array of waypoints (x,y) from workspace on a sequential basis so that a Robot can follow them, point after point.
The index selectors switch to the next index by increasing the data store memory variable "A" by "1" when the Robot reaches the current waypoint within 100 m.
When I run the model the variable "A" jumps to the final value (16 in this case) at the first sample time of simulation. why? any help?
Below is the matlab function block:
function y = fcn(u,n)
global A;
if u<100 && A<n
A = A+1;
end
if A>n
A=n;
end
y = A;
end

回答(1 个)

Manuel
Manuel 2018-1-23
Have you already tried using a LookUp table?
regards mscharff

类别

Help CenterFile Exchange 中查找有关 Block Libraries 的更多信息

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by