Baseline criteria in Test Manager: Is there any method to recapture the baseline criteria and replace the .mat file?
1 次查看(过去 30 天)
显示 更早的评论
I am having more than 100 test cases for a model. When I make any changes to the main model the baseline criteria has to be replaced. Is there any method for replacing the baseline criteria if multiple test cases are available?
0 个评论
回答(1 个)
Rong Mi
2018-8-8
You can try to create 100 iterations instead of having 100 test cases for one model. So in each iteration, you can add a corresponding baseline file for it.
0 个评论