ODE Parameter Optimisation for early convergence

2 次查看(过去 30 天)
I have a system which is quite a bit complicated and is a dynamical system with Stiff requirements. There is a particular gain value which controls the settling time substantially in the final output. I want to plot all the outputs from the resulting variations of that gain. How can I achieve this?
More importantly, that gain causes a waterbed effect(tradeoff between settling time and overshoot) how can I optimise to get the gain value which gives a early settle as well as a robust model. Note the minimum value of the gain is 3.

回答(0 个)

类别

Help CenterFile Exchange 中查找有关 State-Space Control Design and Estimation 的更多信息

产品


版本

R2021a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by