If I call matlabpool open 4 and I have 4 cores, will I work in parallel with 4 or with 3 workers?
显示 更早的评论
Hi, I have a desktop machine with 4 cores available. 1) I wonder whether, calling a pool of 4 workers with the PCT, there will be 4 workers working in parallel, or just 3 since 1 is the client. 2) Working with a cluster workstation (with MDCS), when I connect to the master node (client), I run my code in parallel calling "n" workers, and I want to compare the simulation time of the parallel computation with that of the sequential one (I want to see the speedup). For the sequential computation, should I call in the master node matlabpool open 1 (calling 1 slave node from the master node) or should I work directly with the master node, than I don't need to call a matlabpool? Thank you in advance.
采纳的回答
更多回答(1 个)
类别
在 帮助中心 和 File Exchange 中查找有关 Job and Task Creation 的更多信息
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!