How can I model a time delay estimator and delay a signal by estimated delay when passed through this algorithm??

1 次查看(过去 30 天)
I'm trying to estimate the time delay as shown in the block below. Basically I have identified my reference mode as Discrete State Space and the Plant with Tau( as another Discrete State Space) and trying to create a time delay estimator in discrete time domain.
Continuous time domain when discretized becomes
Lets say I have xhat[k] and then when this is passed through time delay estimator, it should become xhat[k-tauhat]. For initially, this single step is where I'm stuck. I can't multiply xhat[k] and tauhat[k] - this would be incorrect.
Kindly advise me on this

回答(0 个)

类别

Help CenterFile Exchange 中查找有关 Simulink 的更多信息

产品


版本

R2019b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by