Build production plans versus time cycles k =1,...,N responding production queries dk
and miniming the sum of following production costs
i) Fix production cost K_k
ii) Unitary production cost c_k
iii) Stockage unitary cost h_k
Assumption : initial and final stocks are null.
引用格式
Sebastien PARIS (2026). Wagner-Whitin Algorithm (https://ww2.mathworks.cn/matlabcentral/fileexchange/17877-wagner-whitin-algorithm), MATLAB Central File Exchange. 检索时间: .
| 版本 | 已发布 | 发行说明 | Action |
|---|---|---|---|
| 1.0.0.0 |
