Unit commitment by dynamic programming method

unit commitment (plant scheduling) based on the forward DP method

您现在正在关注此提交

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

引用格式

Vladimir Stanojevic (2026). Unit commitment by dynamic programming method (https://ww2.mathworks.cn/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. 检索时间: .

类别

Help CenterMATLAB Answers 中查找有关 Quadratic Programming and Cone Programming 的更多信息

一般信息

MATLAB 版本兼容性

  • 兼容任何版本

平台兼容性

  • Windows
  • macOS
  • Linux
版本 已发布 发行说明 Action
1.0.0.0