Unit commitment by dynamic programming method

unit commitment (plant scheduling) based on the forward DP method
8.8K 次下载
更新时间 2011/7/5

查看许可证

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

引用格式

Vladimir Stanojevic (2025). Unit commitment by dynamic programming method (https://ww2.mathworks.cn/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. 检索时间: .

MATLAB 版本兼容性
创建方式 R2008a
兼容任何版本
平台兼容性
Windows macOS Linux
类别
Help CenterMATLAB Answers 中查找有关 Quadratic Programming and Cone Programming 的更多信息

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!
版本 已发布 发行说明
1.0.0.0