3:58
Video length is 3:58
Grid Synchronization | Evaluating Microgrid Control with Simscape Electrical, Part 4
From the series: Evaluating Microgrid Control with Simscape Electrical
Patrice Brunelle, Hydro Quebec
Graham Dudgeon, MathWorks
In a three-phase electrical power system, if two grids are connected that do not have a synchronized voltage magnitude, frequency and phase, then large current inrush will occur that can damage equipment and compromise system safety and security. Learn how to match microgrid voltage magnitude, frequency and phase with utility grid voltage magnitude, frequency and phase, to minimize current inrush when connecting to the utility grid.
Published: 13 Jun 2022
Download Code and Files
Related Products
Learn More
您也可以从以下列表中选择网站:
如何获得最佳网站性能
选择中国网站(中文或英文)以获得最佳网站性能。其他 MathWorks 国家/地区网站并未针对您所在位置的访问进行优化。
美洲
- América Latina (Español)
- Canada (English)
- United States (English)
欧洲
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
亚太
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)