SimEvents Maximum time as Output
2 次查看(过去 30 天)
显示 更早的评论
Hey folks,
I try to build a scheduling model in Simevents that generates entities at a specific time (from the scheduling time of the workspace). An entity will be generated and run through some simultaneous and serial servers (with different service times) which are representing some processes for this entity. For doing that I used the "replicate" block and the "path combiner" block. Now I just want to know which path was the longest and then to make my new operation scheduling. My problem is that the “path combiner” block still uses the entities which are replicated by the “replicate” block. I thank everyone for any help in advance.
0 个评论
采纳的回答
Devdatt Lad
2011-7-27
Not sure I understand the model enough from your description, but if your system really should have only one entity at a time, and you replicated it just so you could try three different (parallel) scenarios on it, then try using an Entity Combiner instead of a Path Combiner. The former block will combine the multiple replica entities into a single composite entity and carry forward the attributes and timers of the replicas, onto the composite.
This page has information as well as points to examples:
更多回答(0 个)
另请参阅
类别
在 Help Center 和 File Exchange 中查找有关 Discrete-Event Simulation 的更多信息
产品
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!