Info
此问题已关闭。 请重新打开它进行编辑或回答。
why is my code wrong ?
1 次查看(过去 30 天)
显示 更早的评论
Please see the files attached and let me know what is wrong with this
l_dp =
0.7101 0 0 0.0447 0.7701 0 0.0379 0.8407
0 0 0 1.5729 0.0635 0 0 0.5264
1.1636 0.4907 0 0 0.2497 0 1.0603 0
0 0 1.1273 0 0.1478 0 0 1.4100
and this not right since demand on a path should total to one ie the sum of each row should be 1
whats wrong with my code is it ub limit or what ?
Please do help
2 个评论
Geoff Hayes
2014-10-19
Bhavz - where in your code do you force that condition (that each row should sum to one) to be true? Or where do you expect that to be enforced (and why)?
回答(1 个)
Matt J
2014-10-19
编辑:Matt J
2014-10-19
ie the sum of each row should be 1
If the unknown vector x is supposed to satisfy this, then presumably you need to have linear equality constraints,
Aeq=kron(ones(1,8),eye(4));
beq=[1;1;1;1]
[x,fval,exitflag] = ga(@objectiveFun,...
32,[],[],Aeq,beq,lb,[],nonlcon,options);
6 个评论
此问题已关闭。
另请参阅
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!