LSTM open loop testing problem
显示 更早的评论
I have designed a LSTM network for electricity price forecasting. It has 14 input variables and one output (day ahead electricity price). Once I have trained the network, I want to test it with an open loop. My idea is to update the network with real output values "YTest" and save the predicted results in "Y". Obviously, prediction is done with "XTest" values, which are the inputs.
The example given by MathWorks (https://es.mathworks.com/help/deeplearning/ug/time-series-forecasting-using-deep-learning.html) does a prediciton with 1 input and 1 output. As it is a time series, the input is the delayed (t-1) value of the output array. Therefore, when it comes to updating the network "predictandUpdateState" is used. In my case, I want to upddate it with the real values which are saved in the array "YTest".
This is the code that I have tried to use, but the lines which contain [net]=UpdateState are not correct. I attach the used data.
Thank you in advance.
CODE:
XTrain=INPUTSP5LSTM;
YTrain=OUTPUTSP1TRAIN;
XTest=INPUTSP5LSTMTEST;
YTest=OUTPUTSP1TEST;
layers = [
sequenceInputLayer(14,"Name","sequence")
lstmLayer(128,"Name","lstm_1")
lstmLayer(128,"Name","lstm_2")
fullyConnectedLayer(1,"Name","fc")
regressionLayer("Name","regressionoutput")];
options = trainingOptions("adam", ...
'MaxEpochs',100, ...
'GradientThreshold',1,...
'InitialLearnRate',0.005,...
'LearnRateSchedule','piecewise',...
'LearnRateDropPeriod',125,...
'LearnRateDropFactor',0.2,...
'Verbose',0,...
'Plots','training-progress');
net = resetState(net);
offset = 50;
[net] = UpdateState(YTest(:,1:offset));
numTimeSteps = 687;
numPredictionTimeSteps = numTimeSteps - offset;
Y = zero(numPredictionTimeSteps);
for t = 1:numPredictionTimeSteps
Y(:,t) = predict(net,XTest(:,offset+t));
[net]=UpdateState(YTest(:,offset+t));
end
采纳的回答
更多回答(0 个)
类别
在 帮助中心 和 File Exchange 中查找有关 Deep Learning Toolbox 的更多信息
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!