Can power factor (PF) be scheduled in during a 24hour period

2 次查看(过去 30 天)
Good day,
The input to a controlled current source is fed by the attached power factor (PF) block and 1-D look-up data representing a load or irradiance. The reactive power produced by adjusting the PF setpoint is proportional to the active power generated over a 24hour period.
Is there a method to schedule the PF output by switching the signal on/off automatically during a pre-programmed time?
  3 个评论
Bill Murray
Bill Murray 2022-9-4
The irradiance is based on historical data, which is from 06h00 to 18h30. The PF is fixed over this period, say 0.98 leading. I need to vary this signal by switching it on and off at any specific time during the period when active power is being produced, similar to an on/off timing device. The output of the PF block needs to be controlled.
Walter Roberson
Walter Roberson 2022-9-4
What are the modeled consequences of turning it off?
What is the mathematics of turning it off? If, for example, you left it on for 4.5 hours, and turned it off for 0.5 hours, then what would be the mathematical effect?
How quickly can it be changed?
"The irradiance is based on historical data, which is from 06h00 to 18h30"
So... useless for real-world use, making this an academic exercise. If, at any point in the day, the decision to turn the signal on or off depends upon using the historical data as an oracle to predict how the rest of the day will definitely be, then this is all a "would'a-could'a" game.
It would be fair to use the historical data from before the modeled date as statistical, to model probabilities of what the rest of the day might be like -- but you risk failing to meet the target if the actual data does not match predictions.

请先登录,再进行评论。

回答(1 个)

Dallas Perkins
Dallas Perkins 2022-9-28
Hi Bill,
You could use a switch on your output line to change the value between what you have pictured and zero (or some other value). To switch the output at set times you could use something like a pulse generator or repeating sequence stair to specify those times.
Best,
Dallas
  1 个评论
Bill Murray
Bill Murray 2022-10-2
Hi Dallas,
Thank you for the advice. I used the switch on the output with a look-up table as one of the inputs to the switch.
Regards
Bill

请先登录,再进行评论。

类别

Help CenterFile Exchange 中查找有关 Project Management 的更多信息

标签

产品


版本

R2022a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by