how to run a simulation at different times

1 次查看(过去 30 天)
I would like to run my model, lets say 3 days at 40C temperature and 4days at 60C and so on.
As per my understanding and trail, i have used a if block and merge the signals, is it right?
how can i change that time and input value to simulate? iw ould like to see how it's changing with time and temperature.
have a look at the attachments for better view, any views and guidance?

回答(1 个)

Benjamin Thompson
Benjamin Thompson 2022-10-10
You can use the Signal Builder block to configure how you want a signal to change over time. I assume you are simulating the model one time for seven days total.

类别

Help CenterFile Exchange 中查找有关 Sources 的更多信息

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by