merging testcases generated from simulink design verifier

3 次查看(过去 30 天)
I have generated testcases with sldv toolbox. The problem is that the first two or three cases are about 0.7 seconds long, and as the cases grow, test cases get really short, around 0.1 second long. I presuming that sldv toolbox is creating cases for every component in the model to meet the coverage i demanded.
I am hoping to find a way to concat groups of data to make a longer case, or get longer cases that handle multiple coveage components.

采纳的回答

Pat Canny
Pat Canny 2022-12-14
I recommend trying the 'LongTestCases' Test Suite Optimization option, like so:
opts = sldvoptions;
opts.AutomaticStubbing = 'on';
opts.Mode = 'TestGeneration';
opts.ModelCoverageObjectives = 'MCDC';
opts.ReportIncludeGraphics = 'on';
opts.SaveHarnessModel = 'off';
opts.SaveReport = 'off';
opts.TestSuiteOptimization = 'LongTestCases';
Here is a brief description of the option from our documentation:
"When you also specify LongTestcases for the Test suite optimization parameter, the analysis uses successive passes of test generation to extend a potential test case so that it satisfies more objectives. When this happens, the analysis applies the Maximum test case steps parameter to each individual iteration of test generation."

更多回答(0 个)

类别

Help CenterFile Exchange 中查找有关 Generate Tests 的更多信息

产品


版本

R2021a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by