Algebraic loop error - Simulink

回答(1 个)

Paul
Paul 2023-5-17

0 个投票

Hi John,
The model equations as implemented are:
(1) actual_height = new_height
(2) new_height = displacement + actual_height
Or
(3) actual_height = dispslacement + actual_height
which is the algebraic loop.
Is that what the equations should be?

2 个评论

I see the error now. I think I need to add a time delay in the first equation. The ‘new height’ should be actual height but only for the next time step.
Do you think that adding a ‘delay one step’ block, in between the plant ‘new height’ output and ‘actual height’ input, would achieve this?
Adding a delay somewhere between 'actual height' and 'new height' will remove the algebraic loop. But it's probabably an indication that something isn't being modeled correctly in the first place.

请先登录,再进行评论。

类别

帮助中心File Exchange 中查找有关 Modeling 的更多信息

产品

版本

R2023a

提问:

2023-5-17

编辑:

2023-5-20

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by