Error when running function with batch()

11 次查看(过去 30 天)
Hi. I am using batch() to run a function with a par-for loop inside. When I run it as a script (instead of a function), everything works fine. However, when I replace the script with the equivalent function, I get an error. Here are the details:
%(A) Using batch() to call script. This works fine!
job = batch(parcluster('local'), 'batchscript','Pool',5);
%(B) Using batch() to call function. This produces an error.
jm=6;
job = batch(parcluster('local'),'batchfun',0,{jm},'Pool',5);
The script (batchscript.m) I am running in A, looks something like that:
jm = 6;
run('Paths.m') %This creates 'pth' using 'jm'
parfor vh = 1:length(alld)
parfun01(vh,jm,pth)
end
The function (batchfun.m) I am running in B, looks something like that:
function batchfun(jm)
run('Paths.m') %This creates 'pth' using 'jm'
parfor vh = 1:length(alld)
parfun01(vh,jm,pth)
end
They reason why I decided to turn this from a scrip to a function was because I wanted to pass jm as an input, instead of always changing the script. However, I cannot understand why it works perfectly fine as a script, but not as a function.
The error I am getting when running B) is the following:
getReport(job.Tasks(1).Error)
ans =
'Error using batchfun (line 66)
The source code (E:\Analysis\batchfun.m) for the parfor-loop that is trying to
execute on the worker could not be found.
Caused by:
Unrecognized function or variable 'pth'.
Error using remoteParallelFunction (line 84)
Worker unable to find file.
Unrecognized function or variable 'pth'.'
Anyone could please help me with what's wrong? Thanks!

采纳的回答

Edric Ellis
Edric Ellis 2024-5-30
This is nothing to do with batch, and everything to do with workspace transparency. Basically when a parfor loop exists inside a function, it treats any names it sees that are not definitively variables as if they are functions. In other words, the problem is that the function itself does not contain any statements that assign to pth directly.
You could fix this either by converting Paths to be a function returning values as output arguments, or you could push the parfor loop into a function which has specific input arguments which the parfor analysis can understand, like this:
function batchfun(jm)
run('Paths.m') %This creates 'pth' using 'jm'
callParfor(alld, jm, pth)
end
function callParfor(alld, jm, pth)
% All variables accessed here are input arguments to this function, and
% so parfor will understand correctly that they are variables.
parfor vh = 1:length(alld)
parfun01(vh,jm,pth)
end
end
parfor when running in a script (or at the MATLAB command-line) has different behaviour that is less efficient but can see what variables actually exist immediately prior to running the loop.
  1 个评论
Haris K.
Haris K. 2024-5-30
I added the loop as a sub-function inside batchfun and it works fine, exactly as you said. Thank you for the help Edric!

请先登录,再进行评论。

更多回答(0 个)

类别

Help CenterFile Exchange 中查找有关 Parallel Computing Fundamentals 的更多信息

产品


版本

R2020b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by