Difference in results when running the different version but simple script.

2 次查看(过去 30 天)
I make my own script about calculating the transition probability of Markov Chain.I run the two scripts and get different results.Can you detect what makes the difference? What I was doing is
[t,j]=size(sets);
p00=zeros(j,1);
p01=zeros(j,1);
p10=zeros(j,1);
p11=zeros(j,1);
for i=1:j,
prev=sets(1:t-1,i);
next=sets(2:t,i);
p00(i)=sum(prev <= 1 & next <= 1)/sum(sets<=1);
p01(i)=sum(prev <= 1 & next > 1)/sum(sets<=1);
p10(i)=sum(prev > 1 & next <= 1)/sum(sets>1);
p11(i)=sum(prev > 1 & next > 1)/sum(sets>1);
end
Another very similiar version is
for i=1:nv,
s0=sequence(1:nt-1,i);
s1=sequence(2:nt,i);
ndry=length(find(s0 <= threshold));
nwet=length(find(s0 > threshold));
p00(i)=length(find(s0 <= threshold & s1 <= threshold))/ndry;
p01(i)=length(find(s0 <= threshold & s1 > threshold))/ndry;
p10(i)=length(find(s0 > threshold & s1 <= threshold))/nwet;
p11(i)=length(find(s0 > threshold & s1 > threshold))/nwet;
end

回答(0 个)

类别

Help CenterFile Exchange 中查找有关 Physics 的更多信息

标签

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by