to do repeated operation

2 次查看(过去 30 天)
shilpa s
shilpa s 2016-4-12
my project deals with spectrum of water.so we are explaining why peaks ocured in the IR spectrum of water.so i have the simulation data of water molecule.it contains x,y and z coordinates of oxygen and corresponding two hydrogen.so we consider 51 water molecule.so data is like first 51 is the coordinates of oxygen molecule and 52th and 53rd hydrogen belongs to the first oxygen and 54th and 55th hydrogen belongs to 2nd oxygen.i have the equation to find bond lengths and bond angle.but the problem is we have to find bond angle and bond length from almost 1000 frames.in each frames we take the averages.plz help me .i am screwed

回答(1 个)

Muhammad Usman Saleem
use for loop for repeatation of a particular task

类别

Help CenterFile Exchange 中查找有关 Signal Analysis 的更多信息

标签

尚未输入任何标签。

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by