How can I improve my SA algorithm that I used for job scheduling?

2 次查看(过去 30 天)
objective: max sum(solution(i,9))
------------------------------------------
while T>Tmin
for iteration=100
for i=1:61
function(generate_possible_solutions)
random_value = generate random value
solution(i) = generate_possible_solution(random_value, :)
feasible = sum(solution(i, 9))
next
SA:
check feasible
if feasible > previous_feasible
update best
else
check acceptance function
end
if iteration == limit
update (T)
end
end For
end While
Code is above.
I have a problem with job scheduling. My heuristic algorithm uses possible_solution matrix to allocate each job to a line. For example, 6th job has 140 different options, 7th has 30 different options in the possible_solution matrix.
In simulated annealing, in each iteration, I use one of the solution line into the possible_solution matrix randomly. However, the solution reaches 50% at most when it is compared to GAMS/Cplex solver.
May I use the random selection from solution matrix to use Simulated Annealing? and what I have missed?
Thanks and stay safe,