change timetable variable (working day to holiday)

1 次查看(过去 30 天)
Hi all,
i have a timetable that specifies whether a date listed is working day or not-working day, by assigning 1 for working day and 0 for not-working day.
I wish to implement the holidays to the variable 'working day' of the timetable as well by changing the working day (1) to not-working day (0) for the specified dates in the variable 'holiday'.
holiday = {.... '2016-01-01','2016-03-25','2016-03-28','2016-05-01','2016-05-05','2016-05-10','2016-10-03','2016-12-25','2016-12-26'}
How may i implement this change?
Thank you.

采纳的回答

Star Strider
Star Strider 2020-9-26
Try this:
dd = datetime(2016,01,01):days(1):datetime(2016,12,31); % Create ‘datetime’ Array
workday = ones(size(dd(:))); % Define Original ‘workday’
holiday = datetime({'2016-01-01','2016-03-25','2016-03-28','2016-05-01','2016-05-05','2016-05-10','2016-10-03','2016-12-25','2016-12-26'});
TT1 = timetable(dd(:), workday); % Create ‘timetable’ Array
TF = ~ismember(TT1.Time,holiday); % Compare ‘Time’ & ‘holiday’
TT1.workday = +TF; % The ‘+’ Converts ‘TF’ To Numeric
with:
First_5_Rows = TT1(1:5,:)
producinmg:
First_5_Rows =
5×1 timetable
Time workday
___________ _______
01-Jan-2016 0
02-Jan-2016 1
03-Jan-2016 1
04-Jan-2016 1
05-Jan-2016 1
.
  2 个评论
Sehoon Chang
Sehoon Chang 2020-9-26
thanks for your advice.
Is there a possible way to assign all weekends dates (Saturdays and Sundays) along side with holiday dates the value 0? The example you have provided only includes the specified dates of holiday variables.
BR
Star Strider
Star Strider 2020-9-26
My pleasure!
Sure! Add these assignments:
wkdaynr = weekday(TT1.Time); % Numeric Values For ‘weekday’
wdays = ~((wkdaynr == 1) | (wkdaynr == 7)); % Eliminate Saturday & Sunday
so the full code is now:
dd = datetime(2016,01,01):days(1):datetime(2016,12,31); % Create ‘datetime’ Array
workday = ones(size(dd(:))); % Define Original ‘workday’
TT1 = timetable(dd(:), workday); % Create ‘timetable’ Array
holiday = datetime({'2016-01-01','2016-03-25','2016-03-28','2016-05-01','2016-05-05','2016-05-10','2016-10-03','2016-12-25','2016-12-26'});
hdays = ~ismember(TT1.Time,holiday); % Compare ‘Time’ & ‘holiday’
wkdaynr = weekday(TT1.Time); % Numeric Values For ‘weekday’
wdays = ~((wkdaynr == 1) | (wkdaynr == 7)); % Eliminate Saturday & Sunday
TT1.workday = +(hdays & wdays); % Logically ‘AND’ Together, The ‘+’ Converts ‘TF’ To Numeric
with:
First_15_Rows = TT1(1:15,:)
producing:
First_15_Rows =
15×1 timetable
Time workday
___________ _______
01-Jan-2016 0
02-Jan-2016 0
03-Jan-2016 0
04-Jan-2016 1
05-Jan-2016 1
06-Jan-2016 1
07-Jan-2016 1
08-Jan-2016 1
09-Jan-2016 0
10-Jan-2016 0
11-Jan-2016 1
12-Jan-2016 1
13-Jan-2016 1
14-Jan-2016 1
15-Jan-2016 1
The first 3 lines of my code create the timetable array you already have, so just use the last 5 lines (after the blank line). Change ‘TT1’ to your timetable name.
.

请先登录,再进行评论。

更多回答(0 个)

类别

Help CenterFile Exchange 中查找有关 Calendar 的更多信息

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by