Test Sequence - Sample Time period
17 次查看(过去 30 天)
显示 更早的评论
Hello,
I am using a Test Sequence block because I want to stimulate another block in a Test Harness but I have an error in Simulink Test Manager when I run the simulation test because the sample time period of the Test Sequence Block is 0.2 and It requires that the fixed-step size in the model must be a multiple of 0.2. Why?
How can I change the sample time period of test sequence? For example 0.001 s ?
0 个评论
采纳的回答
Srijith Kasaragod
2021-8-30
编辑:Srijith Kasaragod
2021-8-30
As per my understanding, you have chosen fixed-step solver to run the test harness with a step size of 0.5 and then chosen a sample time of 0.2 for your test sequence block. This results in an error as a fixed step size of 0.5 will not be able to cover the rate of execution of test sequence block since 0.2 is less than 0.5. The sample time of all blocks in the model has to be a multiple of solver step size. Alternately, you can also choose a variable-step solver to execute your test harness, by which the solver will automatically choose time steps to cover step size requirements of all blocks included.
Sample time of test sequence block can be modified by opening configuration parameters in the test sequence editor.
0 个评论
更多回答(0 个)
另请参阅
类别
在 Help Center 和 File Exchange 中查找有关 Test Model Components 的更多信息
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!