photo

Zain Ahmed


Last seen: 2 months 前 自 2020 起处于活动状态

Followers: 0   Following: 0

统计学

All
  • First Answer
  • First Submission

查看徽章

Feeds

排序方式:

已回答
Detect peaks before drop in signal
One way you can do is finding the derivative of the signal. For example: if the current derivative is 0 and both previous and n...

2 months 前 | 0

提问


Why cant i install px4 toolbox despite i have wsl2 already installed?
I have installed WSL2 ages ago and installed MATLAB 2023a and then px4 on it. the whole procedure went smoothly. but when i ...

2 months 前 | 1 个回答 | 0

1

个回答

已提交


poly2traj
This function creates a polynomial by specifying initial, and final conditions and durations.

11 months 前 | 1 次下载 |

Thumbnail

提问


Why does my MATLAB suffer GUI glitches in Linux Mint?
Hi, i have installed matlab R2022b on my linux mint 20.3 una, which is based on Ubuntu Focal 20.04. Whenever i open my MATLAB...

1 year 前 | 1 个回答 | 0

1

个回答

提问


How do i set class members by calling its own methods?
I wanted to create a class where i can implement a class and set its members by calling its own methods. This is the example ...

2 years 前 | 1 个回答 | 0

1

个回答

提问


my root locus plot wont show the datatip
i have a root locus plot here: k = 1; s = tf('s'); Gs = 1/(s^2+s); Ks = k*(s+2)/(s+10); sys = Gs*Ks/(1+Gs*Ks); rlocus(sy...

4 years 前 | 2 个回答 | 2

2

个回答

提问


there is not enough symbols
Hi, i wanna telly about this because there is not enough symbols for the matlab livescript: Like large script L.

4 years 前 | 1 个回答 | 0

1

个回答

提问


How do i make a dynamic system model with given Rise time, Setting time and overshoot?
I wanted to make a dynamic system sys = whatever(risetime,settingtime,overshoot); Then i wanted to plot a step response. h...

4 years 前 | 0 个回答 | 0

0

个回答

提问


how do i make a integral control with a setting time 6% of 1 sec
I wanted to make an integral control and i have a state space model. I have to ensure that my controller have setting time of 6...

4 years 前 | 0 个回答 | 0

0

个回答