Community Profile

photo

Ritika Srinivasan


Last seen: 1 year 前 自 2021 起处于活动状态

Followers: 0   Following: 0

统计数据

  • Thankful Level 3
  • Thankful Level 2

查看徽章

Feeds

排序方式:

提问


Logical indexing for two conditions
Hi I have this code: Excess=zeros(size(Energy)); for i=1:length(Energy) if Energy(i)>= 20 Excess(i)=Energy(i)-20...

1 year 前 | 1 个回答 | 0

1

个回答

提问


Replace certain Values within a Matrix Based on Indices from Another matrix
Hello I have two matrices of size 24x365. gridsupplyidx has somevalues gridsupply is a matrix of zeros size 24x365 I would ...

2 years 前 | 2 个回答 | 0

2

个回答

提问


Creating a matrix of different row sizes
Hello, I have a matrix called sorted_dailygrid of size 24x 365 and another matrix called dailygridhours of size 365x1. I would...

2 years 前 | 1 个回答 | 0

1

个回答

提问


Use the values in one matrix as index values to another matrix and replace with a value
Hello, I have a matrix A of size 24 x 365 with certain values and I have a matrix B of zeros of the same size as A. I would li...

2 years 前 | 1 个回答 | 0

1

个回答

提问


Inserting columns of one matrix between the columns of another matrix
Hello, I have two matrices as follows : Sorted_grid of size 24x365 Index of size 24x365 I would like to create a matrix call...

2 years 前 | 1 个回答 | 0

1

个回答

提问


How to apply the IF condition between the time range 4 am to 6pm of everyday of the year
Hi , I am trying to check the load requirement within a certain time range. I have one table with dates and hourly time value i...

2 years 前 | 1 个回答 | 0

1

个回答

提问


How to assign value in an array depending on the index stated in another array
Hi I have an array of size 11x2 where the first column is the index value and the second is the value. I would like to create ...

2 years 前 | 1 个回答 | 0

1

个回答

提问


Incrementing a loop for the next set of values
Hi, I have an array of Pv generation data of size 8760x1 this is code I have : poweredbypv=(zeros(size(8760))); for i=1:24...

2 years 前 | 1 个回答 | 0

1

个回答

提问


Optimization of battery size for a PV solar and electrolysis system
Hi everyone, I have a problem when I have the hourly energy generation values of PV for a year and the electricity consumption...

2 years 前 | 0 个回答 | 0

0

个回答

提问


Index in position 2 exceeds array bounds (must not exceed 1) error while comparing an array with a value
Hi I am trying to compare each element in my column vector 'Energy' with the electrolyser size and then create another column ve...

2 years 前 | 1 个回答 | 0

1

个回答

提问


How to convert 15minute data to hourly data
Hi , I have 15 minute power output data for a Pv powerplant over a year. I would like to convert it into hourly data. I imported...

2 years 前 | 1 个回答 | 0

1

个回答