Feeds
已回答
How can I identify the last active step of a test sequence when the test run stopped (because of reaching a defined stop time) using Simulink Test R2020a?
The approach is to use a "Stop" signal from the Test Sequence block that is set to true when the last test sequence step is exec...
How can I identify the last active step of a test sequence when the test run stopped (because of reaching a defined stop time) using Simulink Test R2020a?
The approach is to use a "Stop" signal from the Test Sequence block that is set to true when the last test sequence step is exec...
1 year 前 | 0
已回答
Programmatically capture baselines for iterations
To have the baseline data in the test case generated from SLDV in SL Test: 1) Select “Include expected output values” in the ...
Programmatically capture baselines for iterations
To have the baseline data in the test case generated from SLDV in SL Test: 1) Select “Include expected output values” in the ...
6 years 前 | 1