HDL "complex to Magnitude and angle" module show critical path which can not meet 160MHz clock timing
3 次查看(过去 30 天)
显示 更早的评论
Hi, experts
I try to use the module of "complex to Magnitude and Angle (CMA)" on xilinx FPGA with clock of 160MHz.
the critical path report in matlab show quadrant correction block in the module(CMA) has 11.5ns critical path delay
Here is the critical path in quadrantCorrection block:
output pipline and distributed pipeline have been enabled. but it does not work. Can someone give some advice to solve the problem?
0 个评论
回答(1 个)
Kiran Kintali
2023-6-19
Would you be able to share your model and HDL Coder code generation steps to reproduce the workflow?
5 个评论
Kiran Kintali
2023-6-21
编辑:Kiran Kintali
2023-6-21
Have you tried synthesizing the design in Vivado? It does seem to meet the timing.
The CPE report is inaccurate as HDL Coder does not have the characterization data for the CPE data base for your selected Target FPGA settings. There is a warning message from HDL Coder report.
Since R2021a you have the capability to generate timing database for your choice of the FPGA, device/family/package/speedgrade.
Generate timing databases for specified target device, device speed grade, and synthesis tool
This will help improve the CPE results (which provide estimates without requiring synthesis).
Critical Path Estimation Without Running Synthesis
另请参阅
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!