Hi everybody, I'm here to ask you if anyone of you has needed to work with a control by time?, because I'm thinking in control the charge and discharge from a system of batteries and I'd like to set 6 hours to charge it and after that time proceed to feed up a load with all energy storage in my batteries bank, but for do it well I need to put in my modelling developed at Simulink/SimPowerSystem blocks a CLOCK, but I haven't found a block that could make me that kind of synchronization in my subsystem. I hope you can help me with this. Thanks in advance!...

采纳的回答

Steve Miller
Steve Miller 2018-1-31
You can include time in your control system using the Clock block. You could save the start time of the charge using an enabled subsystem and just subtract that off of the current time to get the elapsed time.
https://www.mathworks.com/help/simulink/slref/clock.html
--Steve

更多回答(0 个)

社区

更多回答在  Power Electronics Control

类别

Help CenterFile Exchange 中查找有关 Energy Storage 的更多信息

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by