7:32
Video length is 7:32
Testing Generated Code for a Battery Management System (BMS) | Verifying, Validating, and Testing Battery Management Systems, Part 7
From the series: Verifying, Validating, and Testing Battery Management Systems
See how to conduct software-in-the-loop (SIL) and processor-in-the-loop (PIL) testing for code generated from a battery management system (BMS)
Re-use model tests to verify the code coverage and numerical equivalence of the generated code with respect to the Simulink model.
Published: 15 Mar 2020
您也可以从以下列表中选择网站:
如何获得最佳网站性能
选择中国网站(中文或英文)以获得最佳网站性能。其他 MathWorks 国家/地区网站并未针对您所在位置的访问进行优化。
美洲
- América Latina (Español)
- Canada (English)
- United States (English)
欧洲
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
亚太
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)